1. 400 mm Cast-In-Place (CIP), reinforced Concrete Wall and 300mm CIP Floor Slab structure are constructed. 2. Curtain wall end infill rod is set in place. 3. Self adhesive Air/Vapour barrier is applied on the exterior side of the wall and slab end.

Arts_Bridge Sequential_Detail